Go to BuildTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Get
NPS Trailhead Life Cycle Cost Group

Life Cycle Cost Calculation View

Statistical Analysis

Introduction
This tool generates a variety of basic life cycle cost stock statistics for DevTreks components and operations.

Calculation View Description
Sample analysis used in a DevTreks tutorial. v210a

Version: 1.7.0

Feedback About commercial/operationgroup/NPS Trailhead Life Cycle Cost Group/757/operationlcastat1

Step 1 of 3. Make Selections


Date:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?
Compare Using:
Aggregate Using:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Instructions

Step 1

  • Step 1. Base Calculations To Analyze: Operations go into operating budgets. Components go into capital budgets.
  • Step 1. Analysis Type: Totals add together the resource stocks being analyzed. Mean and Standard deviationis not available yet.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
NPS Trailhead Life Cycle Cost Group
Operation Group
NPS Trailhead Life Cycle Cost Group
Total Type Total Mean Median Variance Std Dev
Cost Observations : 6
OC 4,517.00 752.83 825.00 64,571.37 254.11
AOH 0.00 0.00 0.00 0.00 0.00
CAP 0.00 0.00 0.00 0.00 0.00
LCC 4,517.00 752.83 825.00 64,571.37 254.11
Unit 4,517.00 752.83 825.00 64,571.37 254.11
EAA 0.00 0.00 0.00 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 103.500 each 128.00 2,164.50 2,164.50 mater01
This cost derives from ...
Labor 103.500 hour 138.00 2,352.50 2,352.50 labor01
This cost derives from ...
Operation
2007 Trailhead Improvement 01(Amount: 1.000; Date: 12/31/2007
Total Type Total Mean Median Variance Std Dev
Cost Observations : 1
OC 1,050.00 1,050.00 1,050.00 0.00 0.00
AOH 0.00 0.00 0.00 0.00 0.00
CAP 0.00 0.00 0.00 0.00 0.00
LCC 1,050.00 1,050.00 1,050.00 0.00 0.00
Unit 1,050.00 1,050.00 1,050.00 0.00 0.00
EAA 0.00 0.00 0.00 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 25.000 each 20.00 500.00 500.00 mater01
This cost derives from ...
Labor 25.000 hour 22.00 550.00 550.00 labor01
This cost derives from ...
OC Cost AOH Cost CAP Cost LCC Cost Unit Cost EAA Cost
Input: 2007 Trailhead Material and Labor
Totals 1,050.00 0.00 0.00 1,050.00 1,050.00 0.00
Description : Sample analysis used in a DevTreks tutorial. v210a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 25.000 each 20.00 500.00 500.00 mater01
This cost derives from ...
Labor 25.000 hour 22.00 550.00 550.00 labor01
This cost derives from ...
Operation
2007 Trailhead Improvement 02(Amount: 1.000; Date: 12/31/2007
Total Type Total Mean Median Variance Std Dev
Cost Observations : 1
OC 924.00 924.00 924.00 0.00 0.00
AOH 0.00 0.00 0.00 0.00 0.00
CAP 0.00 0.00 0.00 0.00 0.00
LCC 924.00 924.00 924.00 0.00 0.00
Unit 924.00 924.00 924.00 0.00 0.00
EAA 0.00 0.00 0.00 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 22.000 each 20.00 440.00 440.00 mater01
This cost derives from ...
Labor 22.000 hour 22.00 484.00 484.00 labor01
This cost derives from ...
OC Cost AOH Cost CAP Cost LCC Cost Unit Cost EAA Cost
Input: 2007 Trailhead Material and Labor
Totals 924.00 0.00 0.00 924.00 924.00 0.00
Description : Sample analysis used in a DevTreks tutorial. v210a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 22.000 each 20.00 440.00 440.00 mater01
This cost derives from ...
Labor 22.000 hour 22.00 484.00 484.00 labor01
This cost derives from ...
Operation
2008 Trailhead Improvement 01(Amount: 1.000; Date: 12/31/2008
Total Type Total Mean Median Variance Std Dev
Cost Observations : 1
OC 880.00 880.00 880.00 0.00 0.00
AOH 0.00 0.00 0.00 0.00 0.00
CAP 0.00 0.00 0.00 0.00 0.00
LCC 880.00 880.00 880.00 0.00 0.00
Unit 880.00 880.00 880.00 0.00 0.00
EAA 0.00 0.00 0.00 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 20.000 each 21.00 420.00 420.00 mater01
This cost derives from ...
Labor 20.000 hour 23.00 460.00 460.00 labor01
This cost derives from ...
OC Cost AOH Cost CAP Cost LCC Cost Unit Cost EAA Cost
Input: 2008 Trailhead Material and Labor
Totals 880.00 0.00 0.00 880.00 880.00 0.00
Description : Sample analysis used in a DevTreks tutorial. v210a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 20.000 each 21.00 420.00 420.00 mater01
This cost derives from ...
Labor 20.000 hour 23.00 460.00 460.00 labor01
This cost derives from ...
Operation
2008 Trailhead Improvement 02(Amount: 1.000; Date: 12/31/2008
Total Type Total Mean Median Variance Std Dev
Cost Observations : 1
OC 770.00 770.00 770.00 0.00 0.00
AOH 0.00 0.00 0.00 0.00 0.00
CAP 0.00 0.00 0.00 0.00 0.00
LCC 770.00 770.00 770.00 0.00 0.00
Unit 770.00 770.00 770.00 0.00 0.00
EAA 0.00 0.00 0.00 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 17.500 each 21.00 367.50 367.50 mater01
This cost derives from ...
Labor 17.500 hour 23.00 402.50 402.50 labor01
This cost derives from ...
OC Cost AOH Cost CAP Cost LCC Cost Unit Cost EAA Cost
Input: 2008 Trailhead Material and Labor
Totals 770.00 0.00 0.00 770.00 770.00 0.00
Description : Sample analysis used in a DevTreks tutorial. v210a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 17.500 each 21.00 367.50 367.50 mater01
This cost derives from ...
Labor 17.500 hour 23.00 402.50 402.50 labor01
This cost derives from ...
Operation
2009 Trailhead Improvement 01(Amount: 1.000; Date: 12/31/2009
Total Type Total Mean Median Variance Std Dev
Cost Observations : 1
OC 423.00 423.00 423.00 0.00 0.00
AOH 0.00 0.00 0.00 0.00 0.00
CAP 0.00 0.00 0.00 0.00 0.00
LCC 423.00 423.00 423.00 0.00 0.00
Unit 423.00 423.00 423.00 0.00 0.00
EAA 0.00 0.00 0.00 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 9.000 each 23.00 207.00 207.00 mater01
This cost derives from ...
Labor 9.000 hour 24.00 216.00 216.00 labor01
This cost derives from ...
OC Cost AOH Cost CAP Cost LCC Cost Unit Cost EAA Cost
Input: 2009 Trailhead Material and Labor
Totals 423.00 0.00 0.00 423.00 423.00 0.00
Description : Sample analysis used in a DevTreks tutorial. v210a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 9.000 each 23.00 207.00 207.00 mater01
This cost derives from ...
Labor 9.000 hour 24.00 216.00 216.00 labor01
This cost derives from ...
Operation
2009 Trailhead Improvement 02(Amount: 1.000; Date: 12/31/2009
Total Type Total Mean Median Variance Std Dev
Cost Observations : 1
OC 470.00 470.00 470.00 0.00 0.00
AOH 0.00 0.00 0.00 0.00 0.00
CAP 0.00 0.00 0.00 0.00 0.00
LCC 470.00 470.00 470.00 0.00 0.00
Unit 470.00 470.00 470.00 0.00 0.00
EAA 0.00 0.00 0.00 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 10.000 each 23.00 230.00 230.00 mater01
This cost derives from ...
Labor 10.000 hour 24.00 240.00 240.00 labor01
This cost derives from ...
OC Cost AOH Cost CAP Cost LCC Cost Unit Cost EAA Cost
Input: 2009 Trailhead Material and Labor
Totals 470.00 0.00 0.00 470.00 470.00 0.00
Description : Sample analysis used in a DevTreks tutorial. v210a
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 10.000 each 23.00 230.00 230.00 mater01
This cost derives from ...
Labor 10.000 hour 24.00 240.00 240.00 labor01
This cost derives from ...
Dataset: NPS Trailhead Life Cycle Cost Group IRI This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress operation analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.